Shipping unit on truck
|
|
|
|
Lifting first shipping unit from truck
|
|
|
|
Placing first shipping unit (3 girders)
|
|
|
|
Girders being set on bearing pads
|
|
|
|
Setting second shipping unit
|
|
|
|
Cranes lifting shipping units
|
|
|
|
1.5" X 24" girder anchor bolt
|
|
|
|
|
Girder placement nearly complete
|
|
|
|
Installing street signs on Ellsworth Loop Road
|
|
|
|
Pedestrian fence on ballast retainer on bridge
|
|
|
|
Work progressing on UPRR bridge
|
|
|
|
Pump base
|
|
|
|
|
Under side of UPRR bridge
|
|
|
|
|
Water flowing at QC Wash at new bridge
|
|
|
|
Applying Sauereisen at sewer manhole
|
|
|
|
Pump station discharge header
|
|
|
|
Bearing pads with shims
|
|
|
|
Prepping to place grout at bearing pads
|
|
|
|
Cutting girder flange
|
|
|
|
Placing grout at bearing pads
|
|
|
|
|
UPRR crews doing track work
|
|
|
|
SRP conduit at QC Wash
|
|
|
|
Metal conduit for communication lines under QC Wash Bridge
|
|
|
|
Placing epoxy at girder anchor bolts
|
|
|
|
Discharge pipe inside pump station
|
|
|
|
Various railroad bridge photos
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Railroad bridge
|
|
|
|
Grouting riprap at Maricopa County Flood Control District channel
|
|
|
|
Site of future UPRR underpass
|
|
|
|
New guardrail at Queen Creek Wash Bridge
|
|
|
|
Footing for abutment at UPRR Bridge
|
|
|
|
Pouring concrete at UPRR Bridge abutment
|
|
|
|
Steel in abutment footing
|
|
|
|
|
Rolling new rubberized asphalt on Ellsworth Loop Road
|
|
|
|
Inside of pump station
|
|
|
|
Building discharge header at pump station
|
|
|
|
Finish work on retaining wall
|
|
|
|
Moving retaining wall forms
|
|
|
|
Metal railing on retaining wall
|
|
|
|
New median at Ellsworth/Rittenhouse
|
|
|
|
|
UPRR center pier and columns with all of steel
|
|
|
|
Pouring footing at pier footing
|
|
|
|
UPRR abutment
|
|
|
|
Forming pier columns
|
|
|
|
New truncated domes at sidewalk ramp
|
|
|
|
Building false work at pier columns
|
|
|
|
Steel girders for UPRR Bridge
|
|
|
|
|
Newly painted Queen Creek Wash Bridge
|
|
|
|
Drilling bolt holes for girders at UPRR Bridge
|
|
|
|
Lane striping on Ocotillo
|
|
|
|
Painting crosswalk lines on Ellsworth Loop Road
|
|
|
|
New sidewalk along Ellsworth Loop Road
|
|
|
|
Sandblasting retaining wall before painting
|
|
|
|
Painting retaining wall
|
|
|
|
|
UPRR Bridge concrete work complete
|
|
|
|
Excavation on underpass while train travels on railroad detour above
|
|
|
|
Guard rail
|
|
|
|
Guard rail posts
|
|
|
|
Steel girders for railroad bridge
|
|
|
|
Railroad inspection vehicle
|
|
|
|
Riprap at pump station outfall
|
|
|
|
|
Westbound Ocotillo prior to paving
|
|
|
|
Building wing wall at storm drain
|
|
|
|
Milling pavement edge prior to paving
|
|
|
|
Wing wall at storm drain
|
|
|
|
Conveyor belt placing concrete at retaining wall
|
|
|
|
Pumping water from pump station
|
|
|
|
Building retaining wall
|
|
|
|
|
Westbound Ocotillo paved
|
|
|
|
New pavement south of bridge on Ellsworth
|
|
|
|
Electrical conduit
|
|
|
|
Section of railroad track removed for repair
|
|
|
|
Installing handrail on Queen Creek Wash bridge
|
|
|
|
Deck joint at Queen Creek Wash Bridge
|
|
|
|
Deck joint at sidewalk on bridge
|
|
|
|
|
Obliterating traffic lines on Ocotillo
|
|
|
|
Sidewalk formed on bridge
|
|
|
|
Shoring at SRP pole
|
|
|
|
Construction on railroad shoefly begins
|
|
|
|
Preparing to place rip rap at 72" culvert extension
|
|
|
|
Foundation for guard rail on Ellsworth Loop Road south of bridge
|
|
|
|
Railroad shoefly nearing completion
|
|
|
|
|
Newly laid track
|
|
|
|
Forming catch basin
|
|
|
|
Newly poured catch basin
|
|
|
|
South end of Ellsworth Loop Road looking north
|
|
|
|
Pumping flooded retaining wall foundation
|
|
|
|
Partially poured sidewalk at bridge
|
|
|
|
F-shape barrier and forms
|
|
|
|
|
F-shape barrier
|
|
|
|
View between northbound and southbound sides of bridge
|
|
|
|
North side of depressed intersection flooded
|
|
|
|
UPRR crews
|
|
|
|
UPRR crews
|
|
|
|
UPRR crews
|
|
|
|
Trimmer prepping roadway subgrade
|
|
|
|
|
Pouring irrigation collar
|
|
|
|
15 duct electrical bank
|
|
|
|
Parapet wall at QC Wash Bridge
|
|
|
|
Rustication design on parapet wall
|
|
|
|
72" culvert extension at Rittenhouse Channel
|
|
|
|
72" culvert extension at Rittenhouse Channel
|
|
|
|
Scupper and spillway at retention basin
|
|
|
|
|
Ellsworth Loop Road looking north toward Ocotillo
|
|
|
|
Milling Rittenhouse/Ellsworth intersection at night
|
|
|
|
Finish grade at Rittenhouse/Ellsworth intersection
|
|
|
|
Rebar work at RW6 footing
|
|
|
|
Discharge piping at pump station
|
|
|
|
Experts removing bird eggs from SRP pole
|
|
|
|
Eggs ready for transport
|
|
|
|
|
Headwall at 72" culvert extension
|
|
|
|
Backfilling RW5
|
|
|
|
Storm drain intersection at depressed intersection
|
|
|
|
Milling Rittenhouse east of Ellsworth Road
|
|
|
|
Milling
|
|
|
|
New Rittenhouse/Ocotillo intersection partially open
|
|
|
|
UPRR crews relocating signal poles
|
|
|
|
|
Shoring and bracing SRP pole near retaining wall
|
|
|
|
New driveway at medical plaza on Ocotillo
|
|
|
|
Ellsworth Loop Road alignment looking south toward railroad
|
|
|
|
Traffic on new Rittenhouse looking northwest
|
|
|
|
Looking south at Ellsworth Loop Road alignment from Rittenhouse
|
|
|
|
Looking southeast on Rittenhouse at depressed intersection
|
|
|
|
Looking southeast on Rittenhouse just east of Ellsworth Road
|
|
|
|
|
Looking south on Rittenhouse at future Rittenhouse/Ocotillo intersection
|
|
|
|
Queen Creek Wash Bridge from the south side
|
|
|
|
Parapet wall on Queen Creek Wash Bridge
|
|
|
|
Parapet wall
|
|
|
|
Looking north from Queen Creek Wash Bridge
|
|
|
|
Placing approach slab at Queen Creek Wash Bridge
|
|
|
|
Looking north at Ellsworth Loop Road alignment from the north side or railroad
|
|
|
|
|
Blockouts at pump station for water pumping
|
|
|
|
Looking east on Ocotillo at future Rittenhouse/Ocotillo intersection
|
|
|
|
Underside of Queen Creek Wash Bridge
|
|
|
|
Sidewalk ramp with frame for truncated domes
|
|
|
|
Sheet piling with tie-back wall for railroad bridge construction
|
|
|
|
Block out for Q-Street conduit at Queen Creek Wash Bridge
|
|
|
|
Existing headwall at Rittenhouse Channel
|
|
|
|
|
Removing headwall
|
|
|
|
72" RCP extension at Rittenhouse Channel
|
|
|
|
72" RCP extension at Rittenhouse Channel
|
|
|
|
Placing concrete at top deck of pump station
|
|
|
|
Painted retaining wall
|
|
|
|
Installing stell at QC Wash Bridge
|
|
|
|
Back side of retaining wall form with mountain pattern
|
|
|
|
|
Dirt formed for irrigation ditch
|
|
|
|
Concrete irrigation ditch
|
|
|
|
Top of pump station with access hatches in place
|
|
|
|
Deck of QC Wash Bridge after concrete curing
|
|
|
|
Temporary shoring at railroad
|
|
|
|
Electrical junction vaults
|
|
|